-
10kV cold-shrink indoor termination is being used in the administration of power supply in Guangdong province.
-
10kV cold-shrink indoor termination is being used in the administration of power supply in Guangdong province.
-
15kV cold-shrink indoor termination is being used in Beijing Power Supply Company
-
15kV cold-shrink outdoor termination is being used in the Power Supply Company in north Guangzhou
-
20kV 20kV pre-molded outdoor termination is being used in Iranian railway
-
35kV cable accessories are being used in the Tseung Kwan O Line of Hong Kong railway.
-
35kV cable branch cases are being used in Beijing Power Supply Company
-
35kV cable branch case is being used in Tianjing Power Supply Company
-
35kV pre-molded indoor termination is being used in Shanghai Electric Power Company
-
35kV pre-molded outdoor termination is being used in Tianjing Power Supply Company
-
35kV busbar connectors, installed in the C-GIS equipment, are being used in Tianjing administration of power supply
-
35kV busbar connectors, installed in the C-GIS equipment, are being used in Xining a Power Supply Company
-
35kV plug-in cable branch case is being used in Qinghai-Tibet railway
-
35kV plug-in termination is being used in Ningxia wind power plant
-
35kV plug-in terminations are installed in the C-GIS equipment of AREVA.
-
35kV plug-in termination is used in Nanjing railway.
-
335kV cold-shrink joint is being used in Qinghai-Tibet railway
-
35kV cold-shrink joint is being used in Qinghai-Tibet railway
-
35kV cold-shrink outdoor termination is being used in Shanghai area.
-
35kV cold-shrink outdoor termination is being used in Fujian province
-
66kV silicone rubber dry-type termination is being used in Dalian administration of power supply
-
110kV dry type termination with composite insulator in being used in Wuhan Power Supply Company